There are several things that are not included in the standard price. If you have any questions or concerns please contact Cascade Pole Buildings.
- Original Site Preparation (Required to build a structure on)
- Final grade preparation (required to pour a floor upon
- Furnish all permits Good clear access to site for delivery trucks Redi Mix Concrete for concrete pads (two bags per hole)
- Supply 110 power and water within 100 feet
- Costs incurred if heavy equipment, blasting or pumping is required for post holes
- Paint any exposed wood (door jams, Dutch doors etc)