There are several things that are not included in the standard price. If you have any questions or concerns please contact Cascade Pole Buildings.

  • Original Site Preparation (Required to build a structure on)
  • Final grade preparation (required to pour a floor upon
  • Furnish all permits Good clear access to site for delivery trucks Redi Mix Concrete for concrete pads (two bags per hole)
  • Supply 110 power and water within 100 feet
  • Costs incurred if heavy equipment, blasting or pumping is required for post holes
  • Paint any exposed wood (door jams, Dutch doors etc)